Construction is cruising along at the Delta Middle School addition. The block is getting stacked for the second-floor walls, steel continues to get set, steel stud framing is going up, and rough-ins for mechanical, electrical, and plumbing are in the works.


The kitchen and cafeteria are getting framed in, and the hallway leads to the band and choir rooms.


Bar joists cover the ceiling of the band room and scaffolding lines the walls.


The slab has been poured for the second floor.

A lot has happened in the last couple of months! To see 7 weeks of progress in 2 minutes, check out this time lapse video. Even if the wind does blow our camera off course a bit at the 1:30 mark, it’s definitely worth a watch!