KGCI just began a sand settling basin modification project for the FWS at the Hotchkiss National Fish Hatchery.  We’re looking forward to drinking in this view over the summer!  This project includes demolition, piping revisions and addition of a flow meter, construction of a floor drain, installation of a pre-engineered fabric structure, and construction of a concrete lined swale.  More to come!

Clearing and grubbing onsite.