Hotchkiss National Fish Hatchery Sand Settling Basin Modification
- Location: Hotchkiss, CO
- Owner/Designer: FWS/Stantec
- Cost: $394,620.60
- Project Completion: November 2020
Scope
This sand settling basin modification project includes:
- Demolition of concrete, piping, and fencing
- Inlet and outlet piping revisions including addition of a flow meter
- Construction of a piped decant system
- Asphalt paving of the basin’s access road
- Installation of a pre-engineered fabric structure over the basin
- Construction of a concrete lined swale