Hamilton Road Water Main Replacement

  • Location: Cedaredge, CO
  • Owner/Designer: Town of Orchard City
  • Cost: $282,470.00
  • Project Completion: November 2021

Scope

This project included:

  • Installation of 6,500 LF of 8″ C-900 pipe
  • Installation of isolation valves, hydrants and valves, and water taps
  • Two road cuts

Contact Us

Address

Mailing
PO Box 682, Cedaredge, CO 81413

HQ
10094 HWY 65, Austin, CO 81410

Telephone: (970) 835-7910

Fax: (970) 835-7911