Fruitgrowers Dam Outlet Gate Improvements
- Location: Austin, CO
- Owner/Designer: OCID/Bureau of Reclamation
- Cost: $718,531.11
- Projected Completion: March 2024
Scope
This project consisted of dewatering operations during the removal and replacement of existing reservoir emergency and regulating gates and miscellaneous metals. During fabrication of new miscellaneous metals and machining, new valve and pipe sections were installed and a 12’-3” x 9’-9” building was erected. KGCI augured holes for DMEA to install new power poles and run power lines for newly installed meter and SCADA panels. Fabricated pieces were installed, along with the new Circle Ditch slide gate with solar powered actuator assembly.