Hotchkiss National Fish Hatchery Sand Settling Basin Modification

  • Location: Hotchkiss, CO
  • Owner/Designer: FWS/Stantec
  • Cost: $394,620.60
  • Project Completion: November 2020

Scope

This sand settling basin modification project includes:

  • Demolition of concrete, piping, and fencing
  • Inlet and outlet piping revisions including addition of a flow meter
  • Construction of a piped decant system
  • Asphalt paving of the basin’s access road
  • Installation of a pre-engineered fabric structure over the basin
  • Construction of a concrete lined swale

Contact Us

Address

Mailing
PO Box 682, Cedaredge, CO 81413

HQ
10094 HWY 65, Austin, CO 81410

Telephone: (970) 835-7910

Fax: (970) 835-7911